The ship engine repair station
The ship engine repair station is equipped with a 500-ton ship repair frame, which is composed of 5 steel trolleys and 4 tracks. Each trolley is 6 meters long, 7 meters wide, and the net width of the slideway is 1 4 meters. All ships with a total length of 3 5 meters (inclusive), a width of 8 meters (inclusive) and a draft of 3.5 meters in the stern can be put on the shelf for maintenance. There is a set of AC 440V 80HP winches around the frame. The end of the frame is flanked by one AC 220V 5 tonne winch. STATIONARY TWO-STAGE WATER-COOLED 100 HP ELECTRIC COMPRESSOR WITH OUTLET PRESSURE OF 10KG / CM2. and freshwater systems. At present, the operation office is repairing all port support vessels, ship repair racks and various machinery and equipment. If there is any vacancy, it will also accept the overhaul of external ships.
The ship frame repaired by the ship engine
Regulations on water supply operations
- Application procedures:
- The applicant shall go to the Business Division of the Operation Office to apply for the harbor business work notice and prepaid fee.
- The applicant shall complete the application for water supply of the vessel in triplicate and bring it together with the work notice to the local office during working hours for water supply operation.
- Fee collection:
- Charge according to the actual tonnage of water supply.
- The water supply fee is 20 yuan per ton of equipment fee charged by the operation office, and the water supply company charges 25 yuan per ton.
- The minimum chargeable amount of water supply at the wharf is 20 tons for international ships and 10 tons for domestic ships.
- When the water price of the water company is adjusted, the water fee will be adjusted accordingly.
- When working from 16 o'clock to 7 o'clock the next day, in addition to the minimum billing amount, the equipment fee will be charged by 50% according to the actual amount of water.
- When working from 8 a.m. to 17 a.m. on holidays, in addition to the minimum billable amount, the equipment fee will be charged 30% according to the actual amount of water added according to the holiday markup.
- After the wharf water supply is dispatched to work at the applicant's application, if the applicant does not add water to return due to the applicant's reasons, the equipment fee will be charged according to the minimum charge (the water fee is not charged).